Accel-o-Fac® wind-powered WwTP operated by GWM Water for the community of Donald, Australia.
East Harling, Norfolk UK Aero-Fac® PTS (Primary Treatment System) WWTP. Upgrade to existing filter plant. 11+ years of no odours, no sludge, low energy.
Erroll, Scotland Aero-Fac® Municipal WWTP. 20+ years of low OPEX, no odours, little manpower and no sludge.
Owned and operated by the Jamaican National Water Commission, the Greater Portmore WwTP upgraded to an Accel-o-Fac® windpowered system.
Holkham, Norfolk Accel-o-Fac® Zero-to-Low Energy WWTP. Windpowered. No odours, little manpower and Zero sludge for 14+ years.
Accel-o-Fac® wind-powered wastewater treatment upgrade to the Harbour View WWTW located just outside Kingston Town, owned and operated by the National Water Commission.
Accel-o-Fac® windpowered wastewater treatment system for the community of Nelson, New Zealand replaces expensive-to-operate electric aerators in heavily loaded cells.
Crown Estate Sandringham, Norfolk. Aero-Fac® Sludge Digestion System (SDS) WWTP. No odours or sludge. Extreme flow and load swings. 15+ years.
The Sea Crest WwTP owned and operated by the Jamaican National Water Commission is a new 5,500 population equivalent (pe) Aero-Fac® primary treatment cell plus an upgrade of the existing WwTP.
Sutton St James, Norfolk UK Aero-Fac® WWTP for Anglian Water. 12+ years. No odours, no sludge, little manpower, low energy, green footprint.
Tobermory Aero-Fac® Municipal WWTP for island community. Eliminated hauling to mainland 13+ years.
South Gipsland, Australia facility owned by Australian Water Company upgraded existing municipal WwTP, replacing exisitng mechanical aerators with wind energy, thus cutting energy costs significantly.
Aero-Fac® system at Waren Mill, UK for Northumbrian Water just outside Bamburgh serving a flexible flow of 200-3,000 population due to seasonal flows.
Welney-Tipps End UK Aero-Fac® WWTP for Anglian Water. 7+ years with no odour, sludge and little maintenance required.
Crown Estate at Windsor UK Aero-Fac WWTP. Includes some commercial and light industrial flows including variations in flow and loading. Also includes the Cumberland Lodge complex. 10+ years of no odours, no sludge, little manpower and minimal energy costs.
Following 4 years of joint work by Yorkshire Water, Gurney Environmental and Stantec, the construction of the new Aero-Fac® WwTP at Withernsea began in 2020. Serving a normal flow for 15,000 PE, the unique Aero-Fac® is designed to also handle 2X flow peaks.
Access private client areas.
(NOTE: You MUST have already accepted cookies in order to login. If you previously declined cookies, before logging in scroll down to Reconsider Cookies and Accept.
Username
Password
Remember Me
This website uses cookies to manage authentication, navigation, and other functions. By using our website, you agree that we can place these types of cookies on your device.